Structural Steel & Civil Works Contractors · Since 1990

← All projects

Renewal of Pipeline at Baie du Tombeau – Phase 2

Pipeline renewal works for the Central Water Authority.

Client: Central Water Authority

HDPE pipes laid in an excavated trench

Project details

Scope of works

Works for renewal of pipeline consist mainly of:

  • Excavation and backfilling works
  • Laying of HDPE pipe of diameter ranging from 63mm to 110mm
  • Connection works to existing CWA network
  • House connection/reconnection works

Planning a steel or civil works project?

Tell us about the scope and timeline. We take an engineering approach to every job, with competitive prices and precise execution.