- Installation of the construction site base (2 containers)
- Clearing, stripping, excavation, levelling and compaction of the site with a 2 or 3% slope to ensure water drainage
- Supply and installation of the grounding system
- Perimeter mesh fence with gate
- Service building (structural and finishing works including electrical circuits, lighting, air conditioning, metal joinery, raised flooring, waterproofing, painting, etc.)
- Heavy track
- Power transformer oil pit
- Gravel application on the platform